Projects Design and Installation of Parliament Radio In 2017, Stega Engineering was awarded a significant contract to manage the relocation of key broadcasting equipment for the Red House project. This involved transferring components from Tower D on Wrightson Road to the Cabildo Building on St. Vincent Street, Port of Spain. In addition to this complex relocation, Stega Engineering successfully executed the following installations: Aircraft Warning Lights: Installed on the 30-foot tower at the Cabildo Building to ensure compliance with aviation safety standards. Radio Equipment Racks and UPS: Integrated into the telecoms room to support reliable broadcasting operations. Multiple Fiber Connections: Established connections from the telecoms room to production rooms for seamless communication and data transfer. Complete Radio Studio: Designed and installed a full-fledged radio studio, including acoustic treatment and advanced studio equipment, ensuring high-quality broadcasting capabilities. Stega Engineering’s meticulous planning and execution ensured a smooth transition and enhanced the functionality of Parliament’s broadcasting infrastructure. Cumberland Hill Tower Installation After years of delay brought about by COVID this long awaited project has begun. Despite severe weather and other logistical issues, the work is progressing. See progress of work here. Let us know how we can help you with your next project